Crook Log

Crook Log

Client: Bexley PPP
Main Contractor: MJ Gleeson
Subcontractor: MDG Drywall

Water and moisture-resistance were two prime considerations when specifying Knauf Drywall’s Aquapanel as the poolside wall material for the re-development of the swimming pools at the Crook Log and Erith leisure centres. 

Aquapanel was used on the 10 m high walls that surround the competition and teaching pools at Crook Log and on the walls round the two pools at Erith. Matthew Voss, Commercial Director at MDG Drywall explains: 

“Knauf Drywall’s team was involved from the early design stage. We required a tough product that could be used as a tile backer. Knauf’s team recommended Aquapanel as it far exceeded all design stipulations and provided a robust solution that ensures the walls are totally protected from the constant ‘wet’ environment.”