Project Case Studies

At Knauf Drywall, our philosophy is to deliver complete solutions, working closely with all parties throughout the life of a project to ensure that the best results are achieved.

Through this philosophy we are privileged to have been involved with many of the UK’s largest and most prestigious projects. As well as supplying a wide range of products, we pride ourselves on our ability to provide in-depth technical and design assistance throughout all stages of the project.

Latest Projects

Four Dwellings Primary School

Four Dwellings Primary School

dRMM, the award-winning studio of architects and designers, has employed Knauf Aquapanel Exterior to deliver an eye-catching but functional design detail in its design for the newly-rebuilt Four Dwellings Primary School, a £4.5million BSF project in Quinton, Birmingham.

Cofton Holiday Park

Cofton Holiday Park

Innovative plaster products from Knauf Drywall have simplified and accelerated the development of a purpose-built £3 million plus entertainment complex for Cofton Holiday Park, the award winning four star holiday park near Dawlish, Devon.

Accor Hotels

Accor Hotels

Readymix Plasters developed by Knauf Drywall delivered the finest wall finishes possible, ready for decoration, for the fast-track construction programme to develop two major new London hotels in time for the Olympic Games.

News

Knauf Drywall News

Industry News

Twitter @KnaufDrywall

Knauf GIFAfloor takes access flooring to another level http://t.co/VLUVVL0wdm
11 Hours ago