Wednesday 19 November 2008

Knauf Drywall Sittingbourne

Our Sittingbourne Factory

Constructed in 1988, the Sittingbourne Plasterboard plant was brought on line from a green field site in less than twelve months. It is currently one of the fastest running production lines in Europe and has become a model for a new generation of Plasterboard Plants for the Knauf group. 

The production system, which was engineered and designed using the most modern manufacturing technologies enables the production of a wide range of superior quality standard and high performance plasterboards and insulating laminates. 

The Sittingbourne facility is also the location of the UK Plaster Plant which was added in 1993 and produces a comprehensive range of gypsum plaster and jointing products.